This impressive 1.8 million-square-foot, nine-level parking structure utilized more than 67,000 cubic yards of concrete. Connecting to the structure are four precast concrete vehicular bridges, a cast-in-place helix ramp, a cast-in-place two-way crescent ramp, and a structural steel pedestrian bridge. Rubber coated steel expansion joints were selected as a solution to dampen the noise of cars traveling throughout the garage that could otherwise be heard in the nearby neighborhood.
Using three-dimensional laser scanning on the pedestrian bridge –which connects all nine levels of parking to a single public pathway into the theme park – ensured ADA compliance and aided in meeting the schedule. Additional scope items included underground utilities, installing an electrical substation and roadway work leading to the parking structure.
Project Details:
- 1,788,217 gsf
- 67,000 cy of concrete
Owner:
NBCUniversal
General Contractor:
Morley Construction Company
Architect:
International Parking Design
Awards:
ACI Pankow & Concrete Awards (Southern California Chapter) - Charles J. Pankow Jr. Award, Excellence in Concrete